    Pharmaceutical manufacturing scheduling is characterised by batch-based production, strict recipe constraints, and high energy intensity, while existing scheduling approaches often rely on deterministic assumptions and neglect energy-cost considerations. This creates a gap in decision-support tools capable of jointly addressing production efficiency, energy cost, and uncertainty in realistic industrial settings. This work introduces a Constraint Programming (CP) scheduling model to minimise the makespan and electrical energy cost of a batch pharmaceutical manufacturing facility. The model considered uncertainties in processing time, electrical energy consumption and used time-of-use electricity pricing. Uncertainties in processing time and electrical energy consumption were modelled using triangular distribution and linear regression model including normally distributed error term respectively. The problem was formulated as multi-objective optimisation problem. Simulation-optimisation approach utilising Monte Carlo simulation and CP was used to generate a Pareto front between the two objective functions using weighted sum method. The Pareto front was generated by running simulations differed in the processing time, electrical energy consumption and weight of each objective function on parallel CPU cores. Using an industrial case study, the proposed approach identifies schedules with both reduced makespan and substantially lower electrical energy cost compared to the executed production schedule, which represented over 90% of the maximum energy cost on the generated Pareto front. The model can significantly improve the makespan and electrical energy cost compared to the actual schedule, and it can be used to predict the electrical energy cost for a given makespan.

    Original languageEnglish
    Article number112040
    JournalComputers & Industrial Engineering
    Volume217
    DOIs
    Publication statusPublished - Jul 2026

    UN SDGs

    This output contributes to the following UN Sustainable Development Goals (SDGs)

    1. SDG 7 - Affordable and Clean Energy
      SDG 7 Affordable and Clean Energy

    Keywords

    • Batch production Scheduling
    • Constraint programming
    • Makespan & Energy cost minimisation
    • Multi-objective optimisation simulation
    • Time-of-Use tariff